Composite Track System
Non-permeable, Spike-Resistant, Cost-Effective Solution for Training Venues
Composite Track System
Our Composite Track System is an upgraded running surface designed for sports facilities requiring durability, spike resistance, and affordability.
It features a dense PU sealing layer that enhances tensile strength and stability while providing a non-permeable structure to resist water infiltration.
Ideal for schools, universities, and training venues that need a professional-grade performance track without exceeding budget limits.
Structure & Function
Technical Specifications
Parameter | Specification |
Total Thickness | 13–15 mm |
Base Layer Thickness | 8 mm |
PU Sealing Layer | 2 mm |
Wear Layer Thickness | 3-5 mm |
Shore Hardness | 55–65 (A) |
Tensile Strength | ≥ 0.7 MPa |
Elongation at Break | ≥ 150% |
Impact Absorption | ≤ 35–50% |
Vertical Deformation | ≤ 2 mm |
Anti-Skid Value | 89 BPN (20℃) |
Flame Retardant | Level 1 |
Service Life | 8–10 years (normal use) |
Environmental Standards | EU REACH / RoHS / EN14877 compliant |
Surface Color | Red, Green, Blue, Customized |
Suitable Applications
School Playgrounds
Indoor and Outdoor Competition Venues
Training Fields
Key Features
Non-Permeable Design
The composite track features a fully sealed PU surface that effectively prevents water infiltration. This design ensures long-term stability, consistent elasticity, and minimal structural deformation, even under varying weather conditions.
Spike-Resistant Surface
Engineered for professional training use, the surface delivers superior tensile strength and spike resistance compared to permeable systems. Athletes can train in spiked shoes without worrying about surface wear or tearing.
Cost-Effective Performance
Designed for schools, universities, and community sports venues, the system delivers professional-grade quality at a fraction of the cost. It strikes the perfect balance between durability, performance, and budget efficiency.
Long Service Life
The dense structure and high-quality PU materials allow the surface to withstand heavy daily use with minimal maintenance. Even after years of training sessions, the track retains excellent elasticity and appearance.
Competitive Advantages
15+ Years of Expertise
Proven track record in manufacturing and on-site construction of PU and SPU sports surfaces.
Integrated Supply Chain
In-house production of granules, binders, and coatings ensures consistent quality and reliable supply.
Proven Performance
Over 1,000,000 m² of track systems installed — more than 70% have lasted over 8 years.
Superior Quality Control
- High-grade SBR/EPDM granules with uniform size and low dust.
- Premium polyurethane binders with stable viscosity and aging resistance.
- Accurate binder-to-granule ratio (+15–20% PU) for spike-shoe durability.
On-Site Technical Support
Experienced technicians provide guidance to ensure optimal installation and long-term performance.
High Value for Money
Up to 85% of top-tier brand performance at only ~50% of the cost.
Videos
Product Testing & Construction Videos
Spike-resistance and impact testing
On-site construction and PU sealing application
Finished track walkthrough
Let’s Build Your Next Track Project
Contact us today to discuss your project or request a sample.